Description
Efnisyfirlit
- Cover
- Foreword to the Third Edition
- Preface
- Note
- CHAPTER 1: Introduction
- 1.0 EXECUTIVE SUMMARY
- 1.1 INTRODUCTION
- 1.2 THE CURRENT AEC BUSINESS MODEL
- 1.3 DOCUMENTED INEFFICIENCIES OF TRADITIONAL APPROACHES
- 1.4 BIM: NEW TOOLS AND NEW PROCESSES
- 1.5 BIM AS A LIFECYCLE PLATFORM
- 1.6 WHAT IS NOT A BIM PLATFORM?
- 1.7 WHAT ARE THE BENEFITS OF BIM? WHAT PROBLEMS DOES IT ADDRESS?
- 1.8 BIM AND LEAN CONSTRUCTION
- 1.9 WHAT CHALLENGES CAN BE EXPECTED?
- 1.10 FUTURE OF DESIGNING AND BUILDING WITH BIM
- 1.11 CASE STUDIES
- Chapter 1 Discussion Questions
- Note
- CHAPTER 2: Core Technologies and Software
- 2.0 EXECUTIVE SUMMARY
- 2.1 THE EVOLUTION TO OBJECT-BASED PARAMETRIC MODELING
- 2.2 BEYOND PARAMETRIC SHAPES
- 2.3 BIM ENVIRONMENTS, PLATFORMS, AND TOOLS
- 2.4 BIM MODEL QUALITY AND MODEL CHECKING
- 2.5 BIM PLATFORMS
- 2.6 DESIGN REVIEW APPLICATIONS
- 2.7 CONCLUSION
- Chapter 2 Discussion Questions
- CHAPTER 3: Collaboration and Interoperability
- 3.0 EXECUTIVE SUMMARY
- 3.1 INTRODUCTION
- 3.2 DIFFERENT KINDS OF DATA EXCHANGE METHODS
- 3.3 BACKGROUND OF PRODUCT DATA MODELS
- 3.4 OTHER EFFORTS SUPPORTING STANDARDIZATION
- 3.5 THE EVOLUTION FROM FILE-BASED EXCHANGE TO BIM SERVERS
- 3.6 INTERFACING TECHNOLOGIES
- Chapter 3 Discussion Questions
- Notes
- CHAPTER 4: BIM for Owners and Facility Managers
- 4.0 EXECUTIVE SUMMARY
- 4.1 INTRODUCTION: WHY OWNERS SHOULD CARE ABOUT BIM
- 4.2 OWNER’S ROLE IN A BIM PROJECT
- 4.3 COST AND TIME MANAGEMENT
- 4.4 AN OWNER AND FACILITY MANAGER’S BUILDING MODEL
- 4.5 LEADING THE BIM IMPLEMENTATION ON A PROJECT
- 4.6 BARRIERS TO IMPLEMENTING BIM: RISKS AND COMMON MYTHS
- 4.7 ISSUES FOR OWNERS TO CONSIDER WHEN ADOPTING BIM
- Chapter 4 Discussion Questions
- CHAPTER 5: BIM for Architects and Engineers
- 5.0 EXECUTIVE SUMMARY
- 5.1 INTRODUCTION
- 5.2 SCOPE OF DESIGN SERVICES
- 5.3 BIM USE IN DESIGN PROCESSES
- 5.4 BUILDING OBJECT MODELS AND LIBRARIES
- 5.5 CONSIDERATIONS IN ADOPTION FOR DESIGN PRACTICE
- Chapter 5 Discussion Questions
- Notes
- CHAPTER 6: BIM for Contractors
- 6.0 EXECUTIVE SUMMARY
- 6.1 INTRODUCTION
- 6.2 TYPES OF CONSTRUCTION FIRMS
- 6.3 INFORMATION CONTRACTORS WANT FROM BIM
- 6.4 BIM-ENABLED PROCESS CHANGE
- 6.5 DEVELOPING A CONSTRUCTION BUILDING INFORMATION MODEL
- 6.6 USING A CONTRACTOR BUILDING INFORMATION MODEL
- 6.7 3D: VISUALIZATION AND COORDINATION
- 6.8 4D: CONSTRUCTION ANALYSIS AND PLANNING
- 6.9 5D: QUANTITY TAKEOFF AND COST ESTIMATING
- 6.10 PRODUCTION PLANNING AND CONTROL
- 6.11 OFF-SITE FABRICATION AND MODULAR CONSTRUCTION
- 6.12 BIM IN THE FIELD
- 6.13 COST AND SCHEDULE CONTROL AND OTHER MANAGEMENT FUNCTIONS
- 6.14 COMMISSIONING AND TURNOVER
- Chapter 6 Discussion Questions
- Notes
- CHAPTER 7: BIM for Subcontractors and Fabricators
- 7.0 EXECUTIVE SUMMARY
- 7.1 INTRODUCTION
- 7.2 TYPES OF SUBCONTRACTORS AND FABRICATORS
- 7.3 THE BENEFITS OF A BIM PROCESS FOR SUBCONTRACTOR FABRICATORS
- 7.4 GENERIC BIM SYSTEM REQUIREMENTS FOR FABRICATORS
- 7.5 SPECIFIC BIM REQUIREMENTS FOR FABRICATION
- 7.6 ADOPTING BIM IN A FABRICATION OPERATION
- Chapter 7 Discussion Questions
- Notes
- CHAPTER 8: Facilitators of BIM Adoption and Implementation
- 8.0 EXECUTIVE SUMMARY
- 8.1 INTRODUCTION
- 8.2 BIM MANDATES
- 8.3 BIM ROADMAPS, MATURITY MODELS, AND MEASURES
- 8.4 BIM GUIDES
- 8.5 BIM EDUCATION AND TRAINING
- 8.6 LEGAL, SECURITY, AND BEST PRACTICE ISSUES
- Chapter 8 Discussion Questions
- CHAPTER 9: The Future: Building with BIM
- 9.0 EXECUTIVE SUMMARY
- 9.1 INTRODUCTION
- 9.2 BIM BEFORE 2000: PREDICTING TRENDS
- 9.3 DEVELOPMENT AND IMPACT OF BIM: 2000 TO 2017
- 9.4 CURRENT TRENDS
- 9.5 VISION 2025
- 9.6 BEYOND 2025
- Chapter 9 Discussion Questions
- Notes
- CHAPTER 10: BIM Case Studies
- 10.0 INTRODUCTION
- 10.1 NATIONAL CHILDREN’S HOSPITAL, DUBLIN
- 10.2 HYUNDAI MOTORSTUDIO GOYANG, SOUTH KOREA
- 10.3 FONDATION LOUIS VUITTON, PARIS
- 10.4 DONGDAEMUN DESIGN PLAZA, SEOUL, SOUTH KOREA
- 10.5 SAINT JOSEPH HOSPITAL, DENVER
- 10.6 VICTORIA STATION, LONDON UNDERGROUND
- 10.7 NANYANG TECHNOLOGICAL UNIVERSITY STUDENT RESIDENCE HALLS, SINGAPORE
- 10.8 MAPLETREE BUSINESS CITY II, SINGAPORE
- 10.9 PRINCE MOHAMMAD BIN ABDULAZIZ INTERNATIONAL AIRPORT, MEDINA, UAE
- 10.10 HOWARD HUGHES MEDICAL INSTITUTE, CHEVY CHASE, MARYLAND
- 10.11 STANFORD NEUROSCIENCE HEALTH CENTER, PALO ALTO, CALIFORNIA
- Note
- Glossary
- References
- Index
- End User License Agreement




