Construction Project Management

Höfundur S. Keoki Sears, Glenn A. Sears, Richard H. Clough, Jerald L. Rounds, Robert O. Segner

Útgefandi Wiley Professional Development (P&T)

Snið Page Fidelity

Print ISBN 9781118745052

Útgáfa 6

Útgáfuár 2015

13.590 kr.

Description

Efnisyfirlit

  • Construction Project Management
  • Contents
  • Preface
  • 1 Construction Practices
  • 1.1 Introduction
  • 1.2 The Construction Industry
  • 1.3 The Construction Project
  • 1.4 Project Stages
  • 1.5 Owner
  • 1.6 Architect‐Engineer
  • 1.7 Prime Contractor
  • 1.8 Competitive Bidding
  • 1.9 Negotiated Contracts
  • 1.10 Combined Bidding and Negotiation
  • 1.11 Subcontracting
  • 1.12 Design‐Bid‐Construct
  • 1.13 Fast Tracking
  • 1.14 Construction Contract Services
  • 1.15 Construction Services
  • 1.16 Design‐Construct
  • 1.17 Construction Management
  • 1.18 Fixed‐Sum Contract
  • 1.19 Cost‐Plus‐Fee Contracts
  • 1.20 Work‐by‐Force Account
  • 1.21 Turnkey and BOT Contracts
  • 1.22 Integrated Project Delivery
  • 1.23 Speculative Construction
  • 1.24 Management during the Design Phase
  • 1.25 Management of Field Construction
  • 1.26 Project Manager
  • 1.27 Project Manager Qualifications
  • Key Points and Questions
  • 2 Systematic Project Management
  • 2.1 Introduction
  • 2.2 Need for Project Management
  • 2.3 Project Management Characteristics
  • 2.4 Discussion Viewpoint
  • 2.5 Management Procedures
  • 2.6 Time and Cost Management
  • 2.7 Planning and Scheduling
  • 2.8 CPM Procedure
  • 2.9 Time Monitoring and Control
  • 2.10 Project Cost System
  • 2.11 Estimating the Project
  • 2.12 Project Cost Accounting
  • 2.13 Resource Management
  • 2.14 Project Financial Control
  • 2.15 Automating Project Management Tasks
  • 2.16 Manual Methods
  • 2.17 Discussion Format
  • 2.18 Example Projects
  • Key Points and Questions
  • 3 Project Estimating
  • 3.1 Introduction
  • 3.2 Project Cost System
  • 3.3 Preliminary Cost Estimates
  • 3.4 Final Cost Estimate
  • 3.5 Example Projects
  • 3.6 Quantity Survey
  • 3.7 Management Input
  • 3.8 Field Supervision
  • 3.9 Construction Methods
  • 3.10 General Time Schedule
  • 3.11 Construction Equipment
  • 3.12 Summary Sheets
  • 3.13 Material Costs
  • 3.14 Labor Costs
  • 3.15 Indirect Labor Costs
  • 3.16 Labor Unit Costs
  • 3.17 The Cost of Heavy Equipment
  • 3.18 Bids from Subcontractor
  • 3.19 Project Overhead
  • 3.20 Home Office Overhead
  • 3.21 Markup
  • 3.22 Contract Bonds
  • 3.23 Recap Sheet
  • 3.24 Cost Models
  • 3.25 Project Budget
  • 3.26 Progress Estimate
  • 3.27 Estimating for Changes
  • Key Points and Questions
  • 4 Project Planning
  • 4.1 Introduction
  • 4.2 CPM Procedure
  • 4.3 Planning Phase
  • 4.4 Job Activities
  • 4.5 Job Logic
  • 4.6 Restraints
  • 4.7 Beginning‐to‐End Planning
  • 4.8 Top‐Down Planning and the Work Breakdown Structure
  • 4.9 Precedence Notation
  • 4.10 Precedence Diagram
  • 4.11 Network Format
  • 4.12 Lag Relationships
  • 4.13 Precedence Diagram for the Example Projects
  • 4.14 Value of Precedence Network
  • 4.15 Repetitive Operations
  • 4.16 Network Interfaces
  • 4.17 Master Network
  • 4.18 Subnetworks
  • 4.19 Computer Applications for Planning
  • Key Points and Questions
  • 5 Project Scheduling Concepts
  • 5.1 Introduction
  • 5.2 Scheduling Procedure
  • 5.3 Activity Times
  • 5.4 Rules for Estimating Activity Durations
  • 5.5 Estimating Activity Durations
  • 5.6 Time Contingency
  • 5.7 Project Weather Delays
  • 5.8 Network Time Computations
  • 5.9 Early Activity Times
  • 5.10 Project Duration
  • 5.11 Late Activity Times
  • 5.12 Total Float
  • 5.13 Critical Path
  • 5.14 Free Float
  • 5.15 Activity Time Information
  • 5.16 Float Paths
  • 5.17 Early‐Start Schedule
  • 5.18 Tabular Time Schedules
  • 5.19 Activities and Calendar Dates
  • 5.20 Calendars for Weather
  • 5.21 Lags between Activities
  • 5.22 Pipeline Scheduling Computations
  • 5.23 Pipeline Summary Diagram
  • 5.24 Interface Computations
  • 5.25 Hammock Activity
  • 5.26 Milestones
  • 5.27 Time‐Scaled Networks
  • 5.28 Nature and Significance of Floats
  • 5.29 Bar Charts
  • 5.30 Computer Applications for Scheduling
  • Key Points and Questions
  • 6 Production Planning
  • 6.1 Introduction
  • 6.2 Planning Team
  • 6.3 Reengineering the Project
  • 6.4 Planning for Production
  • 6.5 Support Planning
  • 6.6 Technical Problems
  • 6.7 Personnel Planning
  • 6.8 Safety Planning
  • 6.9 Planning for Quality
  • 6.10 Material Ordering and Expediting
  • 6.11 Material Handling, Storage, and Protection
  • 6.12 Equipment Planning
  • 6.13 The New Production Model
  • Key Points and Questions
  • 7 Managing Time
  • 7.1 Introduction
  • 7.2 Time Schedule Adjustments
  • 7.3 Need for Time Reduction
  • 7.4 General Time‐Reduction Procedure
  • 7.5 Shortening the Longest Time Path
  • 7.6 Project Direct Costs
  • 7.7 Variation of Activity Direct Cost with Time
  • 7.8 Project Indirect Costs
  • 7.9 Practical Aspects of Time Reduction
  • 7.10 Reduction of the Highway Bridge Duration
  • 7.11 Time Reduction of Highway Bridge by Expediting
  • 7.12 Least‐Cost Expediting of the Highway Bridge
  • 7.13 Limitations on Time‐Reduction Steps
  • 7.14 Variation of Total Project Cost with Time
  • 7.15 Expedited Highway Bridge Schedule
  • 7.16 Milestone and Interface Events
  • 7.17 Project Extension
  • 7.18 Time Management System
  • 7.19 Aspects of Time Management
  • 7.20 Key‐Date Schedules
  • 7.21 Adjustment of Move‐in Date
  • Key Points and Questions
  • 8 Resource Management
  • 8.1 Introduction
  • 8.2 Objective of Resource Management
  • 8.3 Project Resource Management
  • 8.4 Aspects of Resource Management
  • 8.5 Tabulation of Labor Requirements
  • 8.6 Project Labor Summary
  • 8.7 Variation in Labor Demand
  • 8.8 Manpower Leveling
  • 8.9 Heuristic Manpower Leveling
  • 8.10 Numerical Example
  • 8.11 Labor Leveling in Practice
  • 8.12 Restricted Labor Supply
  • 8.13 Complex Labor Scheduling
  • 8.14 Equipment Management and Scheduling
  • 8.15 The Construction Supply Chain
  • 8.16 Material Scheduling
  • 8.17 Resource Expediting
  • Key Points and Questions
  • 9 Project Scheduling Applications
  • 9.1 Introduction
  • 9.2 Role of the Schedule
  • 9.3 Operational Schedules
  • 9.4 Organizing Schedule Data
  • 9.5 Schedule Presentation Formats
  • 9.6 Schedules for Repetitive Operations
  • 9.7 Impacted Baseline Schedule
  • 9.8 But‐for or Collapsed As‐Built Schedule
  • 9.9 Legal Schedules
  • 9.10 Handling Weather Effects and Other Unknowns
  • 9.11 Presenting the Schedule
  • Key Points and Questions
  • 10 Project Coordination
  • 10.1 Introduction
  • 10.2 Schedule Information on the Job
  • 10.3 Detailed Schedules
  • 10.4 Subcontractor Scheduling
  • 10.5 Activity Planning
  • 10.6 The Last Planner Process©
  • 10.7 Production Checklists
  • 10.8 Look‐Ahead Schedules
  • 10.9 Planning the Paperwork
  • 10.10 Putting the Plans on Paper
  • 10.11 Progress Measurement
  • 10.12 Progress Reporting
  • 10.13 Bar Charts
  • 10.14 Highway Bridge as of July 14
  • 10.15 Weekly Progress Reports
  • 10.16 Field Progress Narrative
  • 10.17 July 21 Status of Highway Bridge
  • 10.18 Progress Analysis
  • 10.19 Schedule Analysis to Determine Project Delays
  • 10.20 Corrective Action
  • 10.21 Network Updating
  • 10.22 Updating Calculations Manually
  • 10.23 Scheduling Software
  • 10.24 Project Progress Curves
  • Key Points and Questions
  • 11 Project Cost System
  • 11.1 Introduction
  • 11.2 The Construction Cost Cycle
  • 11.3 Objectives of a Cost System
  • 11.4 Project Cost Control
  • 11.5 Data for Estimating
  • 11.6 Project Cost Code
  • 11.7 Usage of Project Cost Code
  • 11.8 Project Cost Accounting
  • 11.9 Labor and Equipment Costs
  • 11.10 Cost Accounting Reports
  • 11.11 Labor Time Reporting
  • 11.12 Time Card Preparation
  • 11.13 Measurement of Work Quantities
  • 11.14 Work Quantities from Network Activities
  • 11.15 Cost Records and Reports
  • 11.16 Weekly Labor Reports
  • 11.17 Weekly Labor Cost Report
  • 11.18 Equipment Cost Accounting
  • 11.19 Monthly Cost Forecast
  • 11.20 Time‐Cost Envelope
  • 11.21 Earned Value Management System
  • 11.22 Forecasting Final Project Results Using the EVMS
  • 11.23 Special Cost Accounting Problems
  • 11.24 Production Cost Reduction
  • 11.25 Information for Estimating
  • 11.26 Postproject Evaluation
  • 11.27 Software Applications
  • 11.28 Accuracy of Estimating
  • Key Points and Questions
  • 12 Project Financial Management
  • 12.1 Introduction
  • 12.2 Financial Control
  • 12.3 Progress Payments
  • 12.4 Pay Requests for Unit‐Price Contracts
  • 12.5 Project Cost Breakdown
  • 12.6 Pay Requests for Lump‐Sum Contracts
  • 12.7 Use of Time‐Control Activities for Pay Requests
  • 12.8 Pay Requests for Cost‐Plus Contracts
  • 12.9 Payments to Subcontractors
  • 12.10 Schedule of Payments by Owner—Unit‐Price Contract
  • 12.11 Schedule of Payments by Owner—Lump‐Sum Contract
  • 12.12 Final Payment
  • 12.13 Cash Flow
  • 12.14 Cash Disbursement Forecasts
  • 12.15 Cash Income Forecasts
  • 12.16 Disbursement Controls
  • 12.17 Project Changes
  • 12.18 Contract Change Orders
  • 12.19 Claims
  • 12.20 Daily Job Log
  • Key Points and Questions
  • Index
  • EULA

Additional information

Veldu vöru

Rafbók til eignar

Aðrar vörur

0
    0
    Karfan þín
    Karfan þín er tómAftur í búð