Quality Management

Höfundur Abdul Razzak Rumane

Útgefandi Taylor & Francis

Snið ePub

Print ISBN 9781032454382

Útgáfa 1

Útgáfuár 2024

8.490 kr.

Description

Efnisyfirlit

  • Cover
  • Half-Title
  • Series
  • Title
  • Copyright
  • Dedication
  • Contents
  • Figures
  • Tables
  • Foreword
  • Preface
  • Acknowledgments
  • About the Author
  • Abbreviations
  • Synonyms
  • Chapter 1 Sustainability Framework
  • 1.1 Sustainability
  • 1.2 Development of Sustainable Projects
  • 1.2.1 Sustainability Framework
  • 1.2.2 Sustainable Project Development Process
  • 1.3 Elements of Sustainable Project
  • 1.3.1 Economical
  • 1.3.2 Environmental
  • 1.3.3 Social
  • 1.4 Sustainability Development Goals and Sustainable Project
  • Chapter 2 Overview of Quality in Construction Projects
  • 2.1 Construction Projects
  • 2.2 Quality Definition for Construction Projects
  • 2.2.1 Quality Principles of Construction Projects
  • 2.3 Quality Management System (QMS)
  • 2.3.1 Integrated Quality Management System
  • 2.4 Quality Management in Construction Projects
  • 2.4.1 Quality Plan
  • 2.4.2 Quality Assurance
  • 2.4.3 Quality Control
  • 2.4.4 Quality During the Study Stage
  • 2.4.5 Quality During the Design Stage
  • 2.4.6 Quality During the Bidding and Tendering Stage
  • 2.4.7 Quality During the Construction Stage
  • Chapter 3 Quality Tools for Sustainability
  • 3.1 Introduction
  • 3.2 Categorization of Tools
  • 3.2.1 Classic Quality Tools
  • 3.2.2 Management and Planning Tools:
  • 3.2.3 Process Analysis Tools
  • 3.2.4 Process Improvement Tools
  • 3.2.5 Innovation and Creative Tools
  • 3.2.6 Lean Tools
  • 3.2.7 Cost of Quality
  • 3.2.8 Quality Function Deployment (QFD)
  • 3.2.9 Six Sigma
  • 3.2.10 TRIZ
  • 3.3 Tools for Project Development
  • 3.3.1 Tools for the Study Stage
  • 3.3.2 Tools for the Design Stage
  • 3.3.3 Tools for the Bidding and Tendering Stage
  • 3.3.4 Tools for the Construction Stage
  • Chapter 4 Management of Quality for Sustainability
  • 4.1 Introduction
  • 4.2 Process Group
  • 4.2.1 Initiating Process Group
  • 4.2.2 Planning Process Group
  • 4.2.3 Executing Process Group
  • 4.2.4 Monitoring and Controlling Process Group
  • 4.2.5 Closing Process Group
  • 4.3 Sustainability in the Study Stage
  • 4.3.1 Identification of Need
  • 4.3.2 Feasibility Study
  • 4.3.3 Project Goals and Objectives
  • 4.3.4 Regulatory Clearance
  • 4.3.5 Identification of Alternatives/Options
  • 4.3.6 Development of the Design Basis
  • 4.3.7 Establish Project Delivery and Contracting System
  • 4.3.8 Project Charter
  • 4.4 Sustainability in the Design Stage
  • 4.4.1 The Concept Design
  • 4.4.2 Preliminary Design
  • 4.4.3 Detail Design
  • 4.4.4 Construction Documents
  • 4.5 Sustainability at the Bidding and Tendering Stage
  • 4.5.1 Identify the Stakeholders
  • 4.5.2 Organize the Tendering Documents
  • 4.5.3 Identify the Tendering Procedure
  • 4.5.4 Identify the Bidders
  • 4.5.5 Manage the Tendering Process
  • 4.5.6 Submit/Receive Bids
  • 4.5.7 Manage the Bidding and Tendering Quality
  • 4.5.8 Manage the Tendering Risk
  • 4.5.9 Review the Bid Documents
  • 4.5.10 Award the Contract
  • 4.6 Sustainability in the Construction Stage
  • 4.6.1 Identify the Stakeholders
  • 4.6.2 Mobilization
  • 4.6.3 Development of the Project Site Facilities
  • 4.6.4 Identify the Project Execution/Installation Requirements
  • 4.6.5 Identify the Sustainability Requirements
  • 4.6.6 Develop the Project Execution Scope
  • 4.6.7 Project Planning and Scheduling
  • 4.6.8 Develop Management Plans
  • 4.6.9 Construction/Execution of the Works
  • 4.6.10 Monitoring and Controlling
  • 4.6.11 Inspection of the Executed Works/Systems
  • 4.6.12 Validate the Executed Works
  • 4.7 Testing, Commissioning, and Handover
  • 4.7.1 Identify Stakeholders
  • 4.7.2 Identify Testing, Commissioning, and Handover Requirements
  • 4.7.3 Identify the Sustainability Requirements
  • 4.7.4 Develop Testing, Commissioning Scope
  • 4.7.5 Develop the Inspection and Testing Plan
  • 4.7.6 Execute the Commission Works/Systems
  • 4.7.7 Manage Testing, Commissioning Quality
  • 4.7.8 Develop Documents
  • 4.7.9 Monitor the Work Progress
  • 4.7.10 Train the Owner’s/End-User’s Personnel
  • 4.7.11 Handover of Project
  • 4.7.12 Issue the Substantial Completion Certificate
  • 4.7.13 Lessons Learned
  • 4.7.14 Settle Payments
  • 4.7.15 Settle Claims
  • 4.7.16 Close the Contract
  • Bibliography
  • Index

Additional information

Veldu vöru

Rafbók til eignar

Aðrar vörur

0
    0
    Karfan þín
    Karfan þín er tómAftur í búð